GREENVILLE, S.C. — The apartment tower planned for the long-vacant former Greenville Memorial Auditorium site has a new name. The project once known as the Gateway is now being called Ottaray, and it tops the agenda for the City of Greenville’s Project Preview Meeting on Tuesday, according to WSPA 7News.
Plans for 250 N. Church St. call for 327 rental apartments, a 340-space parking garage and 10,000 square feet of ground-floor commercial space, WSPA reported. The city says the name comes from the Lower Cherokee word for “mountain,” often translated as “Top of the Hill,” and also nods to the historic Ottaray Hotel, which opened downtown in 1909 and was torn down in 1962. The project’s next step is an application to modify its Certificate of Appropriateness through the city’s Design Review Board. Residents can view the plans at a drop-in session from 4 to 6 p.m. at the Civic Design Center, 15 S. Main St.
The development has been years in the making and has changed shape several times. In 2024 the Upstate Business Journal described a two-tower design of 24 and 29 floors with about 243 apartments, while SC Biz News reported a June 2024 version with 342 units and a 360-space garage. In August 2025, Greenville City Council approved a public-private partnership of up to $7.256 million for streetscape, drainage, utility, plaza and public-art improvements around the site, SC Biz News reported. A city release at the time said Miami-based developer NR Investments would put more than $130 million into the 29-story building, which was billed as the tallest in South Carolina. Mayor Knox White said then that the project would “serve as a bridge, better connecting” the arena to downtown, according to the release.
That 2025 coverage said construction was scheduled to begin that September. The project returning to design review more than a year later suggests the schedule has slipped, though current reports do not say when work will start or whether the building’s height or total cost has changed.
For the downtown rental market, 327 units would be a sizable addition on the northern edge of the central business district, near Bon Secours Wellness Arena, on a site that the 2025 city release said had sat vacant for 28 years. Renters and competing apartment owners will want to see the revised unit mix and delivery date, while lenders and investors will be watching whether the rebranded project can move from design approvals to a building permit. The latest plan also trims the ground-floor retail compared with earlier versions, which ranged as high as 14,000 square feet, limiting new storefront space for commercial tenants.
Tuesday’s preview also includes a rezoning request on North Pleasantburg Drive for an inpatient rehabilitation facility and proposed subdivisions on Ebaugh and West Washington streets, according to WSPA.
Sources: WSPA 7News, SC Biz News, SC Biz News, Upstate Business Journal

Leave a Reply